Team Details

LART

University Polytechnic Institute of Leiria
PT Leiria PT short 157
team logo
LocationLeiria, Portugal
Social Media
CV Team FSIPLeiria
Short Linktid.fsg.one/1413
Event Details car 120 - withdrawn

Past Events

Car 24 – 2025
2025
Car #24
Info
93x
Founded in 2006 as Formula IPLeiria, the team is now Leiria Academic Racing Team. After 10 years away, LART returns to FS Germany with its 4th prototype, the first electric and autonomous vehicle: Voidster. Competing for the second year, the Voidster is designed to test and validate theoretical models, optimise key components, and compete in driverless events. It was built on three core principles: simplicity, reliability through extensive testing, and rulebook compliance. LART is ready for FSG!
Engineering Design Priorities:
simplicity reliability scrutineering success driverless rulebook compliance in-house development
Car Specifications
General
Frame Construction Tubular space frame
Material 4130 steel
Overall L 2919 mm
Overall W 1396 mm
Overall H 1240 mm
Wheelbase 1550 mm
Track (Fr) 1200 mm
Track (Rr) 1190 mm
Weight with 68kg driver (Fr) 177 kg
Weight with 68kg driver (Rr) 176 kg
Suspension Double unequal A-Arm. Push rod vertically actuated
Tyres (Fr / Rr) 20.5x7.0-13
Wheels (Fr / Rr) OZ Racing 13
Drive Type Chain driven single gear
Differential Torque sensitive limited slip differential with internal preload adjustment
Cooling Twin side mounted radiators and 130mm fan
Brake System 4-Disk system, 240mm diameter self developed rotors, adjustable brake balance
Electronics Self-dev Vehicle Control Unit and Autonomous Control Unit bridging manual & autonomous
Powertrain
Number of Motors 1
Motor Location Rear
Max Motor Power (per motor) 124kW kW
Motor Type Emrax 228 MV
Max Motor RPM (highest) 6500 rpm
Motor Controller DTI HV 500
Max System Voltage 504 V
Electrode Materials NCA – Graphite–SiO
Combined Accumulator Capacity 7.77 kWh
Transmission Ratio (Primary) 4 : 1
Driverless System
Processing unit(s) Jetson Orin NX 16 GB
Floating Point Operations Per Second of all processing units that are working for the DV system 3760 GigaFLOPS
Power consumption of all processing units that are working for the DV system 25.00 W
Camera(s) 1, 20m, 110º, Zed 2i
Radar sensor(s) 0
Lidar sensor(s) 0
Other sensors 0
Highlights of the DV system Camera-based implementation with focus on simplicity

FS past achievements due to World Ranking Data Base

Date Event Teams Rank BP CM ED SP DV SP AC DV AC AX EN EF Pe Total
2025.08
84
39.
65.
47.
49.
51.
-
46.
19.
38.
28.
-
0.00
249.67
2025.08
12
3.
5.
4.
5.
3.
-
3.
-
4.
-
-
0.00
322.35
x 2

DV Results

Date Event Teams Rank BP CM ED DV SP DV AC AX EN EF Pe Total
2025.08
42
31.
-
-
36.
-
14.
14.
-
-
0.00
63.75
2025.08
4
4.
-
-
4.
-
-
-
-
-
0.00
95.00
x 2

Sign in with a team account to see your team schedule.